-
Word document preview
Facilities and Maintenance SOPs
Portable Electrical Equipment Inspection SOP
3 downloads per free account, no card needed.
Who this is for
A facilities coordinator asked whether every kettle and extension lead must be PAT tested every year, and what the company actually does.
What is inside
- 15 numbered steps in 4 stages: register, user checks, formal inspection and test, defective equipment
- States HSE's position that the law requires safe maintenance, not annual testing as such
- US user check before each shift, per OSHA 1910.334(a)(2), with the exception for equipment left in place
- Interval table with 5 equipment groups, to fill in by risk
- Failed items quarantined in a locked cupboard until repaired and re-tested or scrapped
- 2 named forms, records and approval blocks
How to use it: Set your intervals by risk in section 7, name the inspector or test contractor, then sign the approval block.
Files & formats
- DOCXportable-electrical-equipment-inspection-sop.docx42 KB
Opens in Microsoft Word or Excel, Google Docs or Sheets and LibreOffice. Delivered instantly from your browser.
Free downloads & full access
Every account gets 3 free downloads. Re-downloading a file you already have does not count. This one on its own is $12.99, and buying it keeps your free downloads for something else. Full access is a one-time $249 for all 300 SOPs and the SOP writing kit, for life.
Bought with a different email? Open your account and enter your order number.
Licence
Use and adapt the document inside your own organisation or for your own clients. Do not resell or republish the SOPs themselves. The SOP does not give certification or legal compliance on its own. These SOPs are original working documents built on the public law and guidance named here. They are not legal, safety or compliance advice, are not endorsed by its publisher and do not give compliance on their own. Rules change: check the current official text.



